Control Panels HDPE in 4 mm for Hvac Equipment – Formed to Drawing

Control Panels HDPE in 4 mm for Hvac Equipment – Formed to Drawing

4 mm HDPE control panels manufactured for HVAC equipment: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 3-4 weeks.

Free Quote

These HDPE control panels are thick gauge vacuum formed parts supplied to drawing for HVAC equipment. They are formed from HDPE sheet at 4 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

control panels

Product specification

ItemValue
Productcontrol panels
Typical applicationHVAC equipment
MaterialHDPE
Standard gauge4 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti static coating, satin finish, silk screened markings
Minimum order50 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • Anti static coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • ISO 9001 quality system

Typical applications

  • fan shrouds
  • condensate trays
  • unit covers
  • duct end caps
  • control panels used across general HVAC equipment builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming control panels from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • plan the trim line on a flat face so the router can hold tolerance
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • anti static coating
  • satin finish
  • silk screened markings
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • REACH compliant sheet available
  • PPAP or ISIR on request
  • RoHS compliant grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed control panels ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current control panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message