Thick Gauge ABS Hoods in 10 mm – Elevator And Escalator Interiors Range

Thick Gauge ABS Hoods in 10 mm – Elevator And Escalator Interiors Range

10 mm ABS hoods manufactured for elevator and escalator interiors: ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 2-3 weeks.

Free Quote

These ABS hoods are thick gauge vacuum formed parts supplied to drawing for elevator and escalator interiors. They are formed from ABS sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoods

Product specification

ItemValue
Producthoods
Typical applicationelevator and escalator interiors
MaterialABS
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsas formed gloss, anti graffiti coating, soft touch coating
Minimum order1 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS keeps the weight down while stiffness is held through the formed shape
  • As formed gloss finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • ISO 9001 quality system

Typical applications

  • handrail deck covers
  • ceiling panels
  • landing sill covers
  • car linings
  • hoods used across general elevator and escalator interiors builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming hoods from ABS sheet

Material: ABS

ABS is the default choice where the part needs stiffness, a paint finish and clean trimmed edges. It forms evenly, takes texture well and bonds with standard solvents.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • plan the trim line on a flat face so the router can hold tolerance
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • as formed gloss
  • anti graffiti coating
  • soft touch coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • food contact declarations available
  • dimension reports with every release
  • RoHS compliant grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed hoods ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current hoods with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message