Cable Covers 12 mm TPO Supplier for Food Processing Equipment

Cable Covers 12 mm TPO Supplier for Food Processing Equipment

12 mm TPO cable covers manufactured for food processing: TPO sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 10-15 working days.

Free Quote

These TPO cable covers are thick gauge vacuum formed parts supplied to drawing for food processing. They are formed from TPO sheet at 12 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

cable covers

Product specification

ItemValue
Productcable covers
Typical applicationfood processing
MaterialTPO
Standard gauge12 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti graffiti coating, as formed gloss, silk screened markings
Minimum order100 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • TPO keeps the weight down while stiffness is held through the formed shape
  • Anti graffiti coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • washdown panels
  • product trays
  • mixer covers
  • conveyor guards
  • cable covers used across general food processing builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. The part cools on a jig so the shape is held while the material stabilises.

forming cable covers from TPO sheet

Material: TPO

TPO sheet is used where the part lives outdoors: it stays flexible in the cold and resists UV without a coating.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • anti graffiti coating
  • as formed gloss
  • silk screened markings
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • REACH compliant sheet available
  • dimension reports with every release
  • UL94 V-0 grades available

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed cable covers ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current cable covers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message