Plastic Enclosures 3 mm ASA Supplier for Commercial Laundry Equipment

Plastic Enclosures 3 mm ASA Supplier for Commercial Laundry Equipment

3 mm ASA plastic enclosures manufactured for commercial laundry: ASA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 2-3 weeks.

Free Quote

These ASA plastic enclosures are thick gauge vacuum formed parts supplied to drawing for commercial laundry. They are formed from ASA sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

plastic enclosures

Product specification

ItemValue
Productplastic enclosures
Typical applicationcommercial laundry
MaterialASA
Standard gauge3 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsclear protective film, satin finish, EMI shielding coating
Minimum order100 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ASA keeps the weight down while stiffness is held through the formed shape
  • Clear protective film finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • detergent tray liners
  • machine front panels
  • drum covers
  • control bezels
  • plastic enclosures used across general commercial laundry builds

How it is made

  1. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming plastic enclosures from ASA sheet

Material: ASA

ASA keeps its colour and surface under UV better than ABS, which suits outdoor covers that are not painted.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • avoid sharp steps in the mould, which show as chill marks on the finished surface

Finishing and assembly options

  • clear protective film
  • satin finish
  • EMI shielding coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • UL94 V-0 grades available
  • dimension reports with every release
  • RoHS compliant grades available

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed plastic enclosures ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current plastic enclosures with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message