Thick Gauge ABS/PMMA Centre Consoles in 10 mm – Hydroponics And Greenhouse Range

Thick Gauge ABS/PMMA Centre Consoles in 10 mm – Hydroponics And Greenhouse Range

10 mm ABS/PMMA centre consoles manufactured for hydroponics and greenhouse: ABS/PMMA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 2-3 weeks.

Free Quote

These ABS/PMMA centre consoles are thick gauge vacuum formed parts supplied to drawing for hydroponics and greenhouse. They are formed from ABS/PMMA sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationhydroponics and greenhouse
MaterialABS/PMMA
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionstwo coat polyurethane paint, powder coat finish, matte finish
Minimum order50 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS/PMMA keeps the weight down while stiffness is held through the formed shape
  • Two coat polyurethane paint finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • seedling trays
  • channel covers
  • reservoir liners
  • grow trays
  • centre consoles used across general hydroponics and greenhouse builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming centre consoles from ABS/PMMA sheet

Material: ABS/PMMA

ABS/PMMA combines an ABS core with a hard acrylic cap, so the part has the toughness of ABS and the UV and scratch resistance of acrylic.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • plan the trim line on a flat face so the router can hold tolerance
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • two coat polyurethane paint
  • powder coat finish
  • matte finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • PPAP or ISIR on request
  • RoHS compliant grades available
  • dimension reports with every release

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message