10 mm ABS protective guards manufactured for beauty and spa equipment: ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 2-3 weeks.
Free QuoteThese ABS protective guards are thick gauge vacuum formed parts supplied to drawing for beauty and spa equipment. They are formed from ABS sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | protective guards |
| Typical application | beauty and spa equipment |
| Material | ABS |
| Standard gauge | 10 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | hot stamped accents, as formed gloss, anti static coating |
| Minimum order | 100 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ABS is the default choice where the part needs stiffness, a paint finish and clean trimmed edges. It forms evenly, takes texture well and bonds with standard solvents.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message