OEM Hoods food grade polypropylene in 10 mm for Cleaning And Sanitation Equipment

OEM Hoods food grade polypropylene in 10 mm for Cleaning And Sanitation Equipment

10 mm food grade polypropylene hoods manufactured for cleaning and sanitation equipment: food grade polypropylene sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 2-3 we

Free Quote

These food grade polypropylene hoods are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from food grade polypropylene sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoods

Product specification

ItemValue
Producthoods
Typical applicationcleaning and sanitation equipment
Materialfood grade polypropylene
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti static coating, matte finish, silk screened markings
Minimum order50 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • food grade polypropylene keeps the weight down while stiffness is held through the formed shape
  • Anti static coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • machine covers
  • scrubber tanks
  • solution tank liners
  • tool trays
  • hoods used across general cleaning and sanitation equipment builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming hoods from food grade polypropylene sheet

Material: food grade polypropylene

Food grade polypropylene is used for trays, hoppers and liners that touch product, and it can be washed with caustic cleaners.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • anti static coating
  • matte finish
  • silk screened markings
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • material certificates with every batch
  • REACH compliant sheet available
  • ISO 9001 quality system

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed hoods ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current hoods with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message