Skid Plates UV stabilised HDPE in 12 mm for Garden And Outdoor Power Equipment – Formed to Drawing

Skid Plates UV stabilised HDPE in 12 mm for Garden And Outdoor Power Equipment – Formed to Drawing

12 mm UV stabilised HDPE skid plates manufactured for garden and outdoor power equipment: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 10-15 worki

Free Quote

These UV stabilised HDPE skid plates are thick gauge vacuum formed parts supplied to drawing for garden and outdoor power equipment. They are formed from UV stabilised HDPE sheet at 12 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

skid plates

Product specification

ItemValue
Productskid plates
Typical applicationgarden and outdoor power equipment
MaterialUV stabilised HDPE
Standard gauge12 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti static coating, as formed gloss, anti graffiti coating
Minimum order25 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Anti static coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • ISO 9001 quality system

Typical applications

  • tool trays
  • grass catcher shells
  • mower decks
  • engine covers
  • skid plates used across general garden and outdoor power equipment builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming skid plates from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • avoid sharp steps in the mould, which show as chill marks on the finished surface

Finishing and assembly options

  • anti static coating
  • as formed gloss
  • anti graffiti coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • PPAP or ISIR on request
  • food contact declarations available
  • ISO 9001 quality system

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed skid plates ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current skid plates with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message