5 mm polycarbonate component trays manufactured for industrial robotics: polycarbonate sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 3-4 weeks.
Free QuoteThese polycarbonate component trays are thick gauge vacuum formed parts supplied to drawing for industrial robotics. They are formed from polycarbonate sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | component trays |
| Typical application | industrial robotics |
| Material | polycarbonate |
| Standard gauge | 5 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | hot stamped accents, clear protective film, as formed gloss |
| Minimum order | 1 pieces |
| Lead time to first article | 3–4 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Polycarbonate is used when the housing must survive impact or carry a glazing function. It must be dried before forming or the sheet will bubble.
Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message