OEM Tank Covers UV stabilised HDPE in 1.5 mm for Commercial Laundry

OEM Tank Covers UV stabilised HDPE in 1.5 mm for Commercial Laundry

1.5 mm UV stabilised HDPE tank covers manufactured for commercial laundry: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 3-4 weeks.

Free Quote

These UV stabilised HDPE tank covers are thick gauge vacuum formed parts supplied to drawing for commercial laundry. They are formed from UV stabilised HDPE sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

tank covers

Product specification

ItemValue
Producttank covers
Typical applicationcommercial laundry
MaterialUV stabilised HDPE
Standard gauge1.5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsUV stabilised as formed, anti graffiti coating, satin finish
Minimum order5 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Uv stabilised as formed finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • food contact declarations available

Typical applications

  • detergent tray liners
  • drum covers
  • machine front panels
  • control bezels
  • tank covers used across general commercial laundry builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming tank covers from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • plan the trim line on a flat face so the router can hold tolerance
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • UV stabilised as formed
  • anti graffiti coating
  • satin finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • RoHS compliant grades available
  • UL94 V-0 grades available
  • PPAP or ISIR on request

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed tank covers ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current tank covers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message