PC/ASA Hoppers Vacuum Formed in 2 mm for Playground Equipment

PC/ASA Hoppers Vacuum Formed in 2 mm for Playground Equipment

2 mm PC/ASA hoppers manufactured for playground equipment: PC/ASA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 7-15 working days.

Free Quote

These PC/ASA hoppers are thick gauge vacuum formed parts supplied to drawing for playground equipment. They are formed from PC/ASA sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoppers

Product specification

ItemValue
Producthoppers
Typical applicationplayground equipment
MaterialPC/ASA
Standard gauge2 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspad printed logos, mould texture, EMI shielding coating
Minimum order100 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PC/ASA keeps the weight down while stiffness is held through the formed shape
  • Pad printed logos finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • seat buckets
  • slide shells
  • climbing tower caps
  • panel covers
  • hoppers used across general playground equipment builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming hoppers from PC/ASA sheet

Material: PC/ASA

PC/ASA blends impact strength with weatherability, used for outdoor equipment covers that also need to survive knocks.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • plan the trim line on a flat face so the router can hold tolerance
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • pad printed logos
  • mould texture
  • EMI shielding coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • food contact declarations available
  • dimension reports with every release
  • RoHS compliant grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed hoppers ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current hoppers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message