OEM Centre Consoles LDPE in 1.5 mm for Refrigeration

OEM Centre Consoles LDPE in 1.5 mm for Refrigeration

1.5 mm LDPE centre consoles manufactured for refrigeration: LDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 10-15 working days.

Free Quote

These LDPE centre consoles are thick gauge vacuum formed parts supplied to drawing for refrigeration. They are formed from LDPE sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationrefrigeration
MaterialLDPE
Standard gauge1.5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsclear protective film, mould texture, as formed gloss
Minimum order5 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • LDPE keeps the weight down while stiffness is held through the formed shape
  • Clear protective film finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • condensate trays
  • door panels
  • shelf trays
  • inner liners
  • centre consoles used across general refrigeration builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming centre consoles from LDPE sheet

Material: LDPE

LDPE is flexible and tough in thin section, used for liners and protective covers that have to bend during fitting.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • avoid sharp steps in the mould, which show as chill marks on the finished surface

Finishing and assembly options

  • clear protective film
  • mould texture
  • as formed gloss
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • PPAP or ISIR on request
  • material certificates with every batch
  • dimension reports with every release

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message