6 mm ABS protective guards manufactured for refrigeration: ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 2-3 weeks.

Free Quote

These ABS protective guards are thick gauge vacuum formed parts supplied to drawing for refrigeration. They are formed from ABS sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

protective guards

Product specification

ItemValue
Productprotective guards
Typical applicationrefrigeration
MaterialABS
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspowder coat finish, two coat polyurethane paint, matte finish
Minimum order100 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS keeps the weight down while stiffness is held through the formed shape
  • Powder coat finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • RoHS compliant grades available

Typical applications

  • door panels
  • shelf trays
  • inner liners
  • condensate trays
  • protective guards used across general refrigeration builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming protective guards from ABS sheet

Material: ABS

ABS is the default choice where the part needs stiffness, a paint finish and clean trimmed edges. It forms evenly, takes texture well and bonds with standard solvents.

Design notes

  • plan the trim line on a flat face so the router can hold tolerance
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • powder coat finish
  • two coat polyurethane paint
  • matte finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • material certificates with every batch
  • dimension reports with every release
  • RoHS compliant grades available

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed protective guards ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message