6 mm ESD safe ABS centre consoles manufactured for rail transit interiors: ESD safe ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 7-15 working days.
Free QuoteThese ESD safe ABS centre consoles are thick gauge vacuum formed parts supplied to drawing for rail transit interiors. They are formed from ESD safe ABS sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | centre consoles |
| Typical application | rail transit interiors |
| Material | ESD safe ABS |
| Standard gauge | 6 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | two coat polyurethane paint, anti static coating, EMI shielding coating |
| Minimum order | 1 pieces |
| Lead time to first article | 7–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ESD safe ABS keeps surface resistivity in the dissipative range, used for electronics carriers, tray systems and equipment covers in assembly areas.
Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message