12 mm recycled HDPE skid plates manufactured for fitness equipment: recycled HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 10-15 working days.
Free QuoteThese recycled HDPE skid plates are thick gauge vacuum formed parts supplied to drawing for fitness equipment. They are formed from recycled HDPE sheet at 12 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | skid plates |
| Typical application | fitness equipment |
| Material | recycled HDPE |
| Standard gauge | 12 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | anti graffiti coating, soft touch coating, silk screened markings |
| Minimum order | 50 pieces |
| Lead time to first article | 10–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Recycled HDPE sheet lowers material cost and supports sustainability targets, with mechanical properties close to virgin sheet for non critical parts.
Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Send the drawing or a photo of the current skid plates with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message