OEM Hoppers HDPE in 1.5 mm for Defence And Security Equipment

OEM Hoppers HDPE in 1.5 mm for Defence And Security Equipment

1.5 mm HDPE hoppers manufactured for defence and security equipment: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 7-15 working days.

Free Quote

These HDPE hoppers are thick gauge vacuum formed parts supplied to drawing for defence and security equipment. They are formed from HDPE sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoppers

Product specification

ItemValue
Producthoppers
Typical applicationdefence and security equipment
MaterialHDPE
Standard gauge1.5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsas formed gloss, hot stamped accents, pad printed logos
Minimum order25 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • As formed gloss finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • transport trays
  • case shells
  • antenna covers
  • console covers
  • hoppers used across general defence and security equipment builds

How it is made

  1. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming hoppers from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • as formed gloss
  • hot stamped accents
  • pad printed logos
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • material certificates with every batch
  • ISO 9001 quality system
  • UL94 V-0 grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed hoppers ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current hoppers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message