Hoods 12 mm PC/ASA Supplier for Pool And Spa Equipment

Hoods 12 mm PC/ASA Supplier for Pool And Spa Equipment

12 mm PC/ASA hoods manufactured for pool and spa: PC/ASA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 7-15 working days.

Free Quote

These PC/ASA hoods are thick gauge vacuum formed parts supplied to drawing for pool and spa. They are formed from PC/ASA sheet at 12 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoods

Product specification

ItemValue
Producthoods
Typical applicationpool and spa
MaterialPC/ASA
Standard gauge12 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsEMI shielding coating, powder coat finish, as formed gloss
Minimum order5 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PC/ASA keeps the weight down while stiffness is held through the formed shape
  • Emi shielding coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • RoHS compliant grades available

Typical applications

  • spa side panels
  • pump covers
  • filter housings
  • chemical feeder guards
  • hoods used across general pool and spa builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming hoods from PC/ASA sheet

Material: PC/ASA

PC/ASA blends impact strength with weatherability, used for outdoor equipment covers that also need to survive knocks.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • EMI shielding coating
  • powder coat finish
  • as formed gloss
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • UL94 V-0 grades available
  • material certificates with every batch
  • PPAP or ISIR on request

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed hoods ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current hoods with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message