10 mm HDPE protective guards manufactured for food processing: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 7-15 working days.

Free Quote

These HDPE protective guards are thick gauge vacuum formed parts supplied to drawing for food processing. They are formed from HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

protective guards

Product specification

ItemValue
Productprotective guards
Typical applicationfood processing
MaterialHDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssilk screened markings, powder coat finish, soft touch coating
Minimum order1 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • Silk screened markings finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • product trays
  • washdown panels
  • mixer covers
  • conveyor guards
  • protective guards used across general food processing builds

How it is made

  1. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming protective guards from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • silk screened markings
  • powder coat finish
  • soft touch coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • dimension reports with every release
  • PPAP or ISIR on request
  • UL94 V-0 grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed protective guards ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message