Tank Liners 5 mm TPO Supplier for Motorcycle And Scooter Equipment

Tank Liners 5 mm TPO Supplier for Motorcycle And Scooter Equipment

5 mm TPO tank liners manufactured for motorcycle and scooter: TPO sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 3-4 weeks.

Free Quote

These TPO tank liners are thick gauge vacuum formed parts supplied to drawing for motorcycle and scooter. They are formed from TPO sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

tank liners

Product specification

ItemValue
Producttank liners
Typical applicationmotorcycle and scooter
MaterialTPO
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsas formed gloss, UV stabilised as formed, EMI shielding coating
Minimum order5 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • TPO keeps the weight down while stiffness is held through the formed shape
  • As formed gloss finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • top box shells
  • side covers
  • fairing panels
  • windscreen mounts
  • tank liners used across general motorcycle and scooter builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming tank liners from TPO sheet

Material: TPO

TPO sheet is used where the part lives outdoors: it stays flexible in the cold and resists UV without a coating.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • as formed gloss
  • UV stabilised as formed
  • EMI shielding coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • material certificates with every batch
  • ISO 9001 quality system
  • PPAP or ISIR on request

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed tank liners ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current tank liners with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message