Instrument Bezels TPO in 5 mm for Cleaning And Sanitation Equipment – Formed to Drawing

Instrument Bezels TPO in 5 mm for Cleaning And Sanitation Equipment – Formed to Drawing

5 mm TPO instrument bezels manufactured for cleaning and sanitation equipment: TPO sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 10-15 working days.

Free Quote

These TPO instrument bezels are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from TPO sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

instrument bezels

Product specification

ItemValue
Productinstrument bezels
Typical applicationcleaning and sanitation equipment
MaterialTPO
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmould texture, anti static coating, as formed gloss
Minimum order25 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • TPO keeps the weight down while stiffness is held through the formed shape
  • Mould texture finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • food contact declarations available

Typical applications

  • solution tank liners
  • tool trays
  • machine covers
  • scrubber tanks
  • instrument bezels used across general cleaning and sanitation equipment builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming instrument bezels from TPO sheet

Material: TPO

TPO sheet is used where the part lives outdoors: it stays flexible in the cold and resists UV without a coating.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • mould texture
  • anti static coating
  • as formed gloss
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • ISO 9001 quality system
  • PPAP or ISIR on request
  • UL94 V-0 grades available

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed instrument bezels ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current instrument bezels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message