10 mm UV stabilised HDPE Protective Guards Manufacturer for Playground Equipment

10 mm UV stabilised HDPE Protective Guards Manufacturer for Playground Equipment

10 mm UV stabilised HDPE protective guards manufactured for playground equipment: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 3-4 weeks.

Free Quote

These UV stabilised HDPE protective guards are thick gauge vacuum formed parts supplied to drawing for playground equipment. They are formed from UV stabilised HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

protective guards

Product specification

ItemValue
Productprotective guards
Typical applicationplayground equipment
MaterialUV stabilised HDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionstwo coat polyurethane paint, hot stamped accents, UV stabilised as formed
Minimum order1 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Two coat polyurethane paint finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • ISO 9001 quality system

Typical applications

  • panel covers
  • seat buckets
  • climbing tower caps
  • slide shells
  • protective guards used across general playground equipment builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming protective guards from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • two coat polyurethane paint
  • hot stamped accents
  • UV stabilised as formed
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • material certificates with every batch
  • dimension reports with every release
  • UL94 V-0 grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed protective guards ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message