Home / Product / Custom plastic manufacturing / Splash Guards 2 mm HDPE Supplier for Pool And Spa Equipment /
2 mm HDPE splash guards manufactured for pool and spa: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 10-15 working days.
Free QuoteThese HDPE splash guards are thick gauge vacuum formed parts supplied to drawing for pool and spa. They are formed from HDPE sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | splash guards |
| Typical application | pool and spa |
| Material | HDPE |
| Standard gauge | 2 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | anti static coating, satin finish, clear protective film |
| Minimum order | 5 pieces |
| Lead time to first article | 10–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Send the drawing or a photo of the current splash guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message