flame retardant ABS Centre Consoles Vacuum Formed in 8 mm for Printing And Packaging Machinery

flame retardant ABS Centre Consoles Vacuum Formed in 8 mm for Printing And Packaging Machinery

8 mm flame retardant ABS centre consoles manufactured for printing and packaging machinery: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 3-4 week

Free Quote

These flame retardant ABS centre consoles are thick gauge vacuum formed parts supplied to drawing for printing and packaging machinery. They are formed from flame retardant ABS sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationprinting and packaging machinery
Materialflame retardant ABS
Standard gauge8 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssilk screened markings, matte finish, soft touch coating
Minimum order25 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • flame retardant ABS keeps the weight down while stiffness is held through the formed shape
  • Silk screened markings finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • control panels
  • waste bins
  • ink tray liners
  • feeder covers
  • centre consoles used across general printing and packaging machinery builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming centre consoles from flame retardant ABS sheet

Material: flame retardant ABS

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • silk screened markings
  • matte finish
  • soft touch coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • RoHS compliant grades available
  • UL94 V-0 grades available
  • ISO 9001 quality system

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message