Cart Panels 3 mm Kydex acrylic PVC Supplier for Commercial Laundry Equipment

Cart Panels 3 mm Kydex acrylic PVC Supplier for Commercial Laundry Equipment

3 mm Kydex acrylic PVC cart panels manufactured for commercial laundry: Kydex acrylic PVC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 10-15 working days.

Free Quote

These Kydex acrylic PVC cart panels are thick gauge vacuum formed parts supplied to drawing for commercial laundry. They are formed from Kydex acrylic PVC sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

cart panels

Product specification

ItemValue
Productcart panels
Typical applicationcommercial laundry
MaterialKydex acrylic PVC
Standard gauge3 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsEMI shielding coating, as formed gloss, powder coat finish
Minimum order10 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • Kydex acrylic PVC keeps the weight down while stiffness is held through the formed shape
  • Emi shielding coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • machine front panels
  • detergent tray liners
  • control bezels
  • drum covers
  • cart panels used across general commercial laundry builds

How it is made

  1. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming cart panels from Kydex acrylic PVC sheet

Material: Kydex acrylic PVC

Kydex acrylic PVC sheet is specified for interior trim that must resist scuffing and meet fire, smoke and toxicity rules.

Design notes

  • plan the trim line on a flat face so the router can hold tolerance
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • EMI shielding coating
  • as formed gloss
  • powder coat finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • material certificates with every batch
  • ISO 9001 quality system
  • UL94 V-0 grades available

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed cart panels ready for shipment

Frequently asked questions

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current cart panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message