Thick Gauge polycarbonate Plastic Enclosures in 3 mm – Retail Display Range

Thick Gauge polycarbonate Plastic Enclosures in 3 mm – Retail Display Range

3 mm polycarbonate plastic enclosures manufactured for retail display: polycarbonate sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 7-15 working days.

Free Quote

These polycarbonate plastic enclosures are thick gauge vacuum formed parts supplied to drawing for retail display. They are formed from polycarbonate sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

plastic enclosures

Product specification

ItemValue
Productplastic enclosures
Typical applicationretail display
Materialpolycarbonate
Standard gauge3 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspad printed logos, anti static coating, anti graffiti coating
Minimum order50 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • polycarbonate keeps the weight down while stiffness is held through the formed shape
  • Pad printed logos finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • PPAP or ISIR on request

Typical applications

  • header panels
  • display shells
  • shelf trays
  • counter risers
  • plastic enclosures used across general retail display builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming plastic enclosures from polycarbonate sheet

Material: polycarbonate

Polycarbonate is used when the housing must survive impact or carry a glazing function. It must be dried before forming or the sheet will bubble.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • pad printed logos
  • anti static coating
  • anti graffiti coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • REACH compliant sheet available
  • food contact declarations available
  • dimension reports with every release

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed plastic enclosures ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current plastic enclosures with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message