• Sales@ppoem.com
  • Beijing-time 08:00 am - 5:30 pm
HDPE Component Trays Vacuum Formed in 10 mm for Pool And Spa

HDPE Component Trays Vacuum Formed in 10 mm for Pool And Spa

10 mm HDPE component trays manufactured for pool and spa: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 3-4 weeks.

Free Quote

These HDPE component trays are thick gauge vacuum formed parts supplied to drawing for pool and spa. They are formed from HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

component trays

Product specification

ItemValue
Productcomponent trays
Typical applicationpool and spa
MaterialHDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionstwo coat polyurethane paint, satin finish, silk screened markings
Minimum order25 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • Two coat polyurethane paint finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • filter housings
  • spa side panels
  • pump covers
  • chemical feeder guards
  • component trays used across general pool and spa builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming component trays from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • plan the trim line on a flat face so the router can hold tolerance
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • two coat polyurethane paint
  • satin finish
  • silk screened markings
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • RoHS compliant grades available
  • UL94 V-0 grades available
  • PPAP or ISIR on request

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed component trays ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message