5 mm HIPS display shells manufactured for water treatment: HIPS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 2-3 weeks.
Free QuoteThese HIPS display shells are thick gauge vacuum formed parts supplied to drawing for water treatment. They are formed from HIPS sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | display shells |
| Typical application | water treatment |
| Material | HIPS |
| Standard gauge | 5 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | hot stamped accents, soft touch coating, clear protective film |
| Minimum order | 25 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

HIPS is the low cost route for indoor liners and disposable trays where impact strength is not critical.
Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current display shells with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message