2 mm ASA Protective Guards Manufacturer for Truck And Bus

2 mm ASA Protective Guards Manufacturer for Truck And Bus

2 mm ASA protective guards manufactured for truck and bus: ASA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 2-3 weeks.

Free Quote

These ASA protective guards are thick gauge vacuum formed parts supplied to drawing for truck and bus. They are formed from ASA sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

protective guards

Product specification

ItemValue
Productprotective guards
Typical applicationtruck and bus
MaterialASA
Standard gauge2 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsEMI shielding coating, clear protective film, two coat polyurethane paint
Minimum order25 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ASA keeps the weight down while stiffness is held through the formed shape
  • Emi shielding coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • stepwell panels
  • bunk liners
  • engine tunnel covers
  • interior trim panels
  • protective guards used across general truck and bus builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming protective guards from ASA sheet

Material: ASA

ASA keeps its colour and surface under UV better than ABS, which suits outdoor covers that are not painted.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • EMI shielding coating
  • clear protective film
  • two coat polyurethane paint
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • dimension reports with every release
  • PPAP or ISIR on request
  • RoHS compliant grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed protective guards ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message