1.5 mm polypropylene control panels manufactured for construction machinery: polypropylene sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 3-4 weeks.
Free QuoteThese polypropylene control panels are thick gauge vacuum formed parts supplied to drawing for construction machinery. They are formed from polypropylene sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | control panels |
| Typical application | construction machinery |
| Material | polypropylene |
| Standard gauge | 1.5 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | anti graffiti coating, mould texture, EMI shielding coating |
| Minimum order | 50 pieces |
| Lead time to first article | 3–4 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Polypropylene survives repeated impact and most cleaning chemicals. Its low forming temperature keeps cycles short, but it shrinks more, so the mould is cut with the shrink factor built in.
Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current control panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.