3 mm recycled HDPE splash guards manufactured for animal husbandry: recycled HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 3-4 weeks.
Free QuoteThese recycled HDPE splash guards are thick gauge vacuum formed parts supplied to drawing for animal husbandry. They are formed from recycled HDPE sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | splash guards |
| Typical application | animal husbandry |
| Material | recycled HDPE |
| Standard gauge | 3 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | satin finish, pad printed logos, hot stamped accents |
| Minimum order | 50 pieces |
| Lead time to first article | 3–4 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Recycled HDPE sheet lowers material cost and supports sustainability targets, with mechanical properties close to virgin sheet for non critical parts.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Send the drawing or a photo of the current splash guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.