5 mm ASA Centre Consoles Manufacturer for Material Handling

5 mm ASA Centre Consoles Manufacturer for Material Handling

5 mm ASA centre consoles manufactured for material handling: ASA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 3-4 weeks.

Free Quote

These ASA centre consoles are thick gauge vacuum formed parts supplied to drawing for material handling. They are formed from ASA sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationmaterial handling
MaterialASA
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti static coating, UV stabilised as formed, pad printed logos
Minimum order25 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ASA keeps the weight down while stiffness is held through the formed shape
  • Anti static coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • conveyor covers
  • picker truck panels
  • tote liners
  • pallet tops
  • centre consoles used across general material handling builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming centre consoles from ASA sheet

Material: ASA

ASA keeps its colour and surface under UV better than ABS, which suits outdoor covers that are not painted.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • avoid sharp steps in the mould, which show as chill marks on the finished surface

Finishing and assembly options

  • anti static coating
  • UV stabilised as formed
  • pad printed logos
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • dimension reports with every release
  • PPAP or ISIR on request
  • ISO 9001 quality system

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message