Home / Product / Thermoforming process / OEM Machine Housings LDPE in 2 mm for Solar And Wind Energy /
2 mm LDPE machine housings manufactured for solar and wind energy: LDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 7-15 working days.
Free QuoteThese LDPE machine housings are thick gauge vacuum formed parts supplied to drawing for solar and wind energy. They are formed from LDPE sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | machine housings |
| Typical application | solar and wind energy |
| Material | LDPE |
| Standard gauge | 2 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | powder coat finish, mould texture, clear protective film |
| Minimum order | 5 pieces |
| Lead time to first article | 7–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

LDPE is flexible and tough in thin section, used for liners and protective covers that have to bend during fitting.
Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current machine housings with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message