Cart Panels 1.5 mm HDPE Supplier for Semiconductor Equipment Equipment

Cart Panels 1.5 mm HDPE Supplier for Semiconductor Equipment Equipment

1.5 mm HDPE cart panels manufactured for semiconductor equipment: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 3-4 weeks.

Free Quote

These HDPE cart panels are thick gauge vacuum formed parts supplied to drawing for semiconductor equipment. They are formed from HDPE sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

cart panels

Product specification

ItemValue
Productcart panels
Typical applicationsemiconductor equipment
MaterialHDPE
Standard gauge1.5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionshot stamped accents, UV stabilised as formed, clear protective film
Minimum order10 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • Hot stamped accents finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • RoHS compliant grades available

Typical applications

  • equipment covers
  • chemical tank liners
  • carrier trays
  • fan shrouds
  • cart panels used across general semiconductor equipment builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming cart panels from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • plan the trim line on a flat face so the router can hold tolerance
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • hot stamped accents
  • UV stabilised as formed
  • clear protective film
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • dimension reports with every release
  • PPAP or ISIR on request
  • UL94 V-0 grades available

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed cart panels ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current cart panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message