Home / Product / Custom plastic manufacturing / Battery Boxes 5 mm polypropylene Supplier for Motorcycle And Scooter Equipment /
5 mm polypropylene battery boxes manufactured for motorcycle and scooter: polypropylene sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 10-15 working days.
Free QuoteThese polypropylene battery boxes are thick gauge vacuum formed parts supplied to drawing for motorcycle and scooter. They are formed from polypropylene sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | battery boxes |
| Typical application | motorcycle and scooter |
| Material | polypropylene |
| Standard gauge | 5 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | EMI shielding coating, anti graffiti coating, pad printed logos |
| Minimum order | 1 pieces |
| Lead time to first article | 10–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Polypropylene survives repeated impact and most cleaning chemicals. Its low forming temperature keeps cycles short, but it shrinks more, so the mould is cut with the shrink factor built in.
Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Send the drawing or a photo of the current battery boxes with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message