Vacuum formed battery boxes in 6 mm food grade polypropylene for cleaning and sanitation equipment: process, tooling, tolerances from 6 mm sheet, first article in 7-15 days, 5-axis trimming and inspec
Vacuum formed battery boxes in 12 mm ABS/PC for water treatment: process, tooling, tolerances from 12 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed machine housings in 12 mm food grade polypropylene for construction machinery: process, tooling, tolerances from 12 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed hoppers in 12 mm TPO for agricultural machinery: process, tooling, tolerances from 12 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed wheel covers in 12 mm ABS/PMMA for elevator and escalator interiors: process, tooling, tolerances from 12 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed cable covers in 4 mm polycarbonate for food processing: process, tooling, tolerances from 4 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed carry cases in 1.5 mm ASA for material handling: process, tooling, tolerances from 1.5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed tank liners in 6 mm HDPE for beauty and spa equipment: process, tooling, tolerances from 6 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed battery boxes in 3 mm TPO for pool and spa: process, tooling, tolerances from 3 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed machine housings in 1.5 mm PETG for cleaning and sanitation equipment: process, tooling, tolerances from 1.5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed battery boxes in 1.5 mm ESD safe ABS for material handling: process, tooling, tolerances from 1.5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.
Vacuum formed tank covers in 3 mm ASA for defence and security equipment: process, tooling, tolerances from 3 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.