ESD safe ABS Cable Covers for Medical Equipment – Process, Tooling and Lead Time

Vacuum formed cable covers in 1.5 mm ESD safe ABS for medical equipment: process, tooling, tolerances from 1.5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Tank Covers Thermoforming Solution for Elevator And Escalator Interiors in PETG

Vacuum formed tank covers in 3 mm PETG for elevator and escalator interiors: process, tooling, tolerances from 3 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Kydex acrylic PVC Machine Housings for Medical Equipment – Process, Tooling and Lead Time

Vacuum formed machine housings in 10 mm Kydex acrylic PVC for medical equipment: process, tooling, tolerances from 10 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Protective Guards Thermoforming Solution for Garden And Outdoor Power Equipment in PC/ASA

Vacuum formed protective guards in 6 mm PC/ASA for garden and outdoor power equipment: process, tooling, tolerances from 6 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

recycled HDPE Wheel Covers for Beauty And Spa Equipment – Process, Tooling and Lead Time

Vacuum formed wheel covers in 10 mm recycled HDPE for beauty and spa equipment: process, tooling, tolerances from 10 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Instrument Bezels Thermoforming Solution for Beauty And Spa Equipment in Kydex acrylic PVC

Vacuum formed instrument bezels in 1.5 mm Kydex acrylic PVC for beauty and spa equipment: process, tooling, tolerances from 1.5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

HDPE Equipment Covers for Pool And Spa – Process, Tooling and Lead Time

Vacuum formed equipment covers in 12 mm HDPE for pool and spa: process, tooling, tolerances from 12 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Instrument Bezels Thermoforming Solution for Garden And Outdoor Power Equipment in recycled HDPE

Vacuum formed instrument bezels in 1.5 mm recycled HDPE for garden and outdoor power equipment: process, tooling, tolerances from 1.5 mm sheet, first article in 7-15 days, 5-axis trimming and inspecti

0 Views PPOEM 17 Sep,2026

polypropylene Hoods for Rail Transit Interiors – Process, Tooling and Lead Time

Vacuum formed hoods in 12 mm polypropylene for rail transit interiors: process, tooling, tolerances from 12 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Door Panels Thermoforming Solution for Aerospace Interiors in ABS/PC

Vacuum formed door panels in 8 mm ABS/PC for aerospace interiors: process, tooling, tolerances from 8 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

food grade polypropylene Storage Bins for Motorcycle And Scooter – Process, Tooling and Lead Time

Vacuum formed storage bins in 1.5 mm food grade polypropylene for motorcycle and scooter: process, tooling, tolerances from 1.5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Sign Faces Thermoforming Solution for Water Treatment in PVC

Vacuum formed sign faces in 3 mm PVC for water treatment: process, tooling, tolerances from 3 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026