HDPE Equipment Covers for Hvac Equipment – Process, Tooling and Lead Time

Vacuum formed equipment covers in 8 mm HDPE for HVAC equipment: process, tooling, tolerances from 8 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Skid Plates Thermoforming Solution for Laboratory Instruments in PMMA acrylic

Vacuum formed skid plates in 10 mm PMMA acrylic for laboratory instruments: process, tooling, tolerances from 10 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

recycled HDPE Protective Guards for Hvac Equipment – Process, Tooling and Lead Time

Vacuum formed protective guards in 2 mm recycled HDPE for HVAC equipment: process, tooling, tolerances from 2 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Cowls Thermoforming Solution for Defence And Security Equipment in HIPS

Vacuum formed cowls in 6 mm HIPS for defence and security equipment: process, tooling, tolerances from 6 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

ABS/PC Carry Cases for Commercial Laundry – Process, Tooling and Lead Time

Vacuum formed carry cases in 2 mm ABS/PC for commercial laundry: process, tooling, tolerances from 2 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Control Panels Thermoforming Solution for Signage And Wayfinding in UV stabilised HDPE

Vacuum formed control panels in 3 mm UV stabilised HDPE for signage and wayfinding: process, tooling, tolerances from 3 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Aerospace Interiors Light Housings in HDPE: Thick Gauge Forming and Specification

Vacuum formed light housings in 1.5 mm HDPE for aerospace interiors: process, tooling, tolerances from 1.5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

food grade polypropylene Light Housings for Marine And Boat Building – Process, Tooling and Lead Time

Vacuum formed light housings in 10 mm food grade polypropylene for marine and boat building: process, tooling, tolerances from 10 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Medical Equipment Battery Boxes in polypropylene: Thick Gauge Forming and Specification

Vacuum formed battery boxes in 2 mm polypropylene for medical equipment: process, tooling, tolerances from 2 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Hoppers Thermoforming Solution for Cleaning And Sanitation Equipment in ABS/PC

Vacuum formed hoppers in 2 mm ABS/PC for cleaning and sanitation equipment: process, tooling, tolerances from 2 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

HDPE Cart Panels for Retail Display – Process, Tooling and Lead Time

Vacuum formed cart panels in 5 mm HDPE for retail display: process, tooling, tolerances from 5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Rail Transit Interiors Protective Guards in UV stabilised HDPE: Thick Gauge Forming and Specification

Vacuum formed protective guards in 6 mm UV stabilised HDPE for rail transit interiors: process, tooling, tolerances from 6 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026