Commercial Laundry Machine Housings in ABS/PMMA: Thick Gauge Forming and Specification

Vacuum formed machine housings in 5 mm ABS/PMMA for commercial laundry: process, tooling, tolerances from 5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Signage And Wayfinding Machine Housings in ESD safe ABS: Thick Gauge Forming and Specification

Vacuum formed machine housings in 8 mm ESD safe ABS for signage and wayfinding: process, tooling, tolerances from 8 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Thick Gauge Vacuum Forming of Skid Plates in Motorcycle And Scooter at 10 mm

Vacuum formed skid plates in 10 mm ABS for motorcycle and scooter: process, tooling, tolerances from 10 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Printing And Packaging Machinery Hoppers in HIPS: Thick Gauge Forming and Specification

Vacuum formed hoppers in 3 mm HIPS for printing and packaging machinery: process, tooling, tolerances from 3 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Thick Gauge Vacuum Forming of Cowls in Catering And Kitchen Equipment at 3 mm

Vacuum formed cowls in 3 mm ABS/PC for catering and kitchen equipment: process, tooling, tolerances from 3 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Fitness Equipment Instrument Bezels in LDPE: Thick Gauge Forming and Specification

Vacuum formed instrument bezels in 10 mm LDPE for fitness equipment: process, tooling, tolerances from 10 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Thick Gauge Vacuum Forming of Cowls in Semiconductor Equipment at 6 mm

Vacuum formed cowls in 6 mm polypropylene for semiconductor equipment: process, tooling, tolerances from 6 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Garden And Outdoor Power Equipment Hoods in polypropylene: Thick Gauge Forming and Specification

Vacuum formed hoods in 12 mm polypropylene for garden and outdoor power equipment: process, tooling, tolerances from 12 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

ABS/PC Cart Panels for Ev Charging – Process, Tooling and Lead Time

Vacuum formed cart panels in 8 mm ABS/PC for EV charging: process, tooling, tolerances from 8 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Storage Bins Thermoforming Solution for Food Processing in polypropylene

Vacuum formed storage bins in 4 mm polypropylene for food processing: process, tooling, tolerances from 4 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

ASA Cowls for Catering And Kitchen Equipment – Process, Tooling and Lead Time

Vacuum formed cowls in 12 mm ASA for catering and kitchen equipment: process, tooling, tolerances from 12 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

ESD safe ABS Centre Consoles for Dental Equipment – Process, Tooling and Lead Time

Vacuum formed centre consoles in 2 mm ESD safe ABS for dental equipment: process, tooling, tolerances from 2 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026