HDPE Storage Bins for Aerospace Interiors – 10 mm Sheet, Tooling and Lead Time

Vacuum formed storage bins in 10 mm HDPE for aerospace interiors: process, tooling, tolerances from 10 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

polycarbonate Hoppers for Cleaning And Sanitation Equipment – 5 mm Sheet, Tooling and Lead Time

Vacuum formed hoppers in 5 mm polycarbonate for cleaning and sanitation equipment: process, tooling, tolerances from 5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Machine Housings Thermoforming in PVC for Motorcycle And Scooter at 10 mm

Vacuum formed machine housings in 10 mm PVC for motorcycle and scooter: process, tooling, tolerances from 10 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

PVC Cable Covers for Rail Transit Interiors – 5 mm Sheet, Tooling and Lead Time

Vacuum formed cable covers in 5 mm PVC for rail transit interiors: process, tooling, tolerances from 5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Instrument Bezels Thermoforming in flame retardant ABS for Dental Equipment at 12 mm

Vacuum formed instrument bezels in 12 mm flame retardant ABS for dental equipment: process, tooling, tolerances from 12 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Machine Housings Thermoforming in ABS/PC for Telecom And Network Cabinets at 3 mm

Vacuum formed machine housings in 3 mm ABS/PC for telecom and network cabinets: process, tooling, tolerances from 3 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

PMMA acrylic Hoppers for Semiconductor Equipment – 1.5 mm Sheet, Tooling and Lead Time

Vacuum formed hoppers in 1.5 mm PMMA acrylic for semiconductor equipment: process, tooling, tolerances from 1.5 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Tank Covers Thermoforming in HDPE for Dental Equipment at 10 mm

Vacuum formed tank covers in 10 mm HDPE for dental equipment: process, tooling, tolerances from 10 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

flame retardant ABS Component Trays for Aerospace Interiors – 4 mm Sheet, Tooling and Lead Time

Vacuum formed component trays in 4 mm flame retardant ABS for aerospace interiors: process, tooling, tolerances from 4 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

ABS/PC Plastic Enclosures for Telecom And Network Cabinets – 4 mm Sheet, Tooling and Lead Time

Vacuum formed plastic enclosures in 4 mm ABS/PC for telecom and network cabinets: process, tooling, tolerances from 4 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Skid Plates Thermoforming in polycarbonate for Printing And Packaging Machinery at 4 mm

Vacuum formed skid plates in 4 mm polycarbonate for printing and packaging machinery: process, tooling, tolerances from 4 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026

Custom Light Housings Thermoforming in polycarbonate for Dental Equipment at 2 mm

Vacuum formed light housings in 2 mm polycarbonate for dental equipment: process, tooling, tolerances from 2 mm sheet, first article in 7-15 days, 5-axis trimming and inspection.

0 Views PPOEM 17 Sep,2026