Case Study: flame retardant ABS Instrument Bezels for Cleaning And Sanitation Equipment – 900 Parts at 8 mm

Vacuum forming case study: instrument bezels for cleaning and sanitation equipment produced in 8 mm flame retardant ABS, 900 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Refrigeration Builder Replaced a welded steel fabrication with Vacuum Formed Wheel Covers in ESD safe ABS

Vacuum forming case study: wheel covers for refrigeration produced in 1.5 mm ESD safe ABS, 250 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Vending And Kiosk Case: 12 mm TPO Splash Guards from Drawing to Production

Vacuum forming case study: splash guards for vending and kiosk produced in 12 mm TPO, 3600 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

2400 Protective Guards ESD safe ABS Thermoformed for Fitness Equipment in 3 Weeks

Vacuum forming case study: protective guards for fitness equipment produced in 2 mm ESD safe ABS, 2400 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

900 Wheel Covers HDPE Thermoformed for Hydroponics And Greenhouse in 4 Weeks

Vacuum forming case study: wheel covers for hydroponics and greenhouse produced in 10 mm HDPE, 900 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: ABS/PMMA Cowls for Laboratory Instruments – 120 Parts at 10 mm

Vacuum forming case study: cowls for laboratory instruments produced in 10 mm ABS/PMMA, 120 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Office Furniture Builder Replaced a machined aluminium housing with Vacuum Formed Sign Faces in flame retardant ABS

Vacuum forming case study: sign faces for office furniture produced in 5 mm flame retardant ABS, 400 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Water Treatment Case: 2 mm PC/ASA Hoppers from Drawing to Production

Vacuum forming case study: hoppers for water treatment produced in 2 mm PC/ASA, 400 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

2400 Light Housings HIPS Thermoformed for Pool And Spa in 6 Weeks

Vacuum forming case study: light housings for pool and spa produced in 10 mm HIPS, 2400 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: recycled HDPE Access Panels for Refrigeration – 1500 Parts at 10 mm

Vacuum forming case study: access panels for refrigeration produced in 10 mm recycled HDPE, 1500 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Beauty And Spa Equipment Builder Replaced a rotomoulded shell with Vacuum Formed Equipment Covers in polypropylene

Vacuum forming case study: equipment covers for beauty and spa equipment produced in 8 mm polypropylene, 8000 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Ev Charging Case: 12 mm TPO Dashboards from Drawing to Production

Vacuum forming case study: dashboards for EV charging produced in 12 mm TPO, 1500 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026