Refrigeration Case: 2 mm PETG Cable Covers from Drawing to Production

Vacuum forming case study: cable covers for refrigeration produced in 2 mm PETG, 1500 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

600 Display Shells polypropylene Thermoformed for Animal Husbandry in 8 Weeks

Vacuum forming case study: display shells for animal husbandry produced in 12 mm polypropylene, 600 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: ASA Instrument Bezels for Marine And Boat Building – 120 Parts at 4 mm

Vacuum forming case study: instrument bezels for marine and boat building produced in 4 mm ASA, 120 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

120 Access Panels PC/ASA Thermoformed for Food Processing in 5 Weeks

Vacuum forming case study: access panels for food processing produced in 12 mm PC/ASA, 120 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: recycled HDPE Wheel Covers for Medical Equipment – 8000 Parts at 4 mm

Vacuum forming case study: wheel covers for medical equipment produced in 4 mm recycled HDPE, 8000 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Elevator And Escalator Interiors Builder Replaced a machined aluminium housing with Vacuum Formed Tank Covers in HDPE

Vacuum forming case study: tank covers for elevator and escalator interiors produced in 10 mm HDPE, 2400 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

2400 Door Panels LDPE Thermoformed for Water Treatment in 8 Weeks

Vacuum forming case study: door panels for water treatment produced in 2 mm LDPE, 2400 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: PC/ASA Protective Guards for Hvac Equipment – 900 Parts at 1.5 mm

Vacuum forming case study: protective guards for HVAC equipment produced in 1.5 mm PC/ASA, 900 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Material Handling Builder Replaced an injection moulded part with Vacuum Formed Ventilation Shrouds in ABS

Vacuum forming case study: ventilation shrouds for material handling produced in 3 mm ABS, 900 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Fitness Equipment Case: 12 mm ABS/PMMA Tank Covers from Drawing to Production

Vacuum forming case study: tank covers for fitness equipment produced in 12 mm ABS/PMMA, 8000 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Water Treatment Builder Replaced a machined aluminium housing with Vacuum Formed Control Panels in food grade polypropylene

Vacuum forming case study: control panels for water treatment produced in 12 mm food grade polypropylene, 5000 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Telecom And Network Cabinets Case: 4 mm LDPE Skid Plates from Drawing to Production

Vacuum forming case study: skid plates for telecom and network cabinets produced in 4 mm LDPE, 600 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026