Industrial Robotics Case: 1.5 mm flame retardant ABS Display Shells from Drawing to Production

Vacuum forming case study: display shells for industrial robotics produced in 1.5 mm flame retardant ABS, 120 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: HIPS Light Housings for Garden And Outdoor Power Equipment – 2400 Parts at 5 mm

Vacuum forming case study: light housings for garden and outdoor power equipment produced in 5 mm HIPS, 2400 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Dental Equipment Builder Replaced a machined aluminium housing with Vacuum Formed Sign Faces in ABS/PC

Vacuum forming case study: sign faces for dental equipment produced in 12 mm ABS/PC, 1500 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Telecom And Network Cabinets Case: 1.5 mm recycled HDPE Ventilation Shrouds from Drawing to Production

Vacuum forming case study: ventilation shrouds for telecom and network cabinets produced in 1.5 mm recycled HDPE, 8000 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Semiconductor Equipment Builder Replaced a rotomoulded shell with Vacuum Formed Hoods in HIPS

Vacuum forming case study: hoods for semiconductor equipment produced in 3 mm HIPS, 600 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: PC/ASA Wheel Covers for Refrigeration – 120 Parts at 4 mm

Vacuum forming case study: wheel covers for refrigeration produced in 4 mm PC/ASA, 120 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

5000 Wheel Covers flame retardant ABS Thermoformed for Ev Charging in 4 Weeks

Vacuum forming case study: wheel covers for EV charging produced in 12 mm flame retardant ABS, 5000 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Catering And Kitchen Equipment Case: 2 mm HIPS Door Panels from Drawing to Production

Vacuum forming case study: door panels for catering and kitchen equipment produced in 2 mm HIPS, 600 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: UV stabilised HDPE Component Trays for Retail Display – 1500 Parts at 4 mm

Vacuum forming case study: component trays for retail display produced in 4 mm UV stabilised HDPE, 1500 pieces, tooling to first article in 3 weeks, full dimensional reporting.

1 Views PPOEM 17 Sep,2026

Case Study: UV stabilised HDPE Cable Covers for Vending And Kiosk – 1500 Parts at 12 mm

Vacuum forming case study: cable covers for vending and kiosk produced in 12 mm UV stabilised HDPE, 1500 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

8000 Instrument Bezels LDPE Thermoformed for Defence And Security Equipment in 5 Weeks

Vacuum forming case study: instrument bezels for defence and security equipment produced in 1.5 mm LDPE, 8000 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

1500 Storage Bins PC/ASA Thermoformed for Truck And Bus in 6 Weeks

Vacuum forming case study: storage bins for truck and bus produced in 8 mm PC/ASA, 1500 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026