Case Study: LDPE Carry Cases for Refrigeration – 400 Parts at 5 mm

Vacuum forming case study: carry cases for refrigeration produced in 5 mm LDPE, 400 pieces, tooling to first article in 8 weeks, full dimensional reporting.

1 Views PPOEM 17 Sep,2026

Motorcycle And Scooter Case: 6 mm flame retardant ABS Storage Bins from Drawing to Production

Vacuum forming case study: storage bins for motorcycle and scooter produced in 6 mm flame retardant ABS, 1500 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: ABS/PC Component Trays for Construction Machinery – 900 Parts at 5 mm

Vacuum forming case study: component trays for construction machinery produced in 5 mm ABS/PC, 900 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

900 Centre Consoles food grade polypropylene Thermoformed for Elevator And Escalator Interiors in 6 Weeks

Vacuum forming case study: centre consoles for elevator and escalator interiors produced in 4 mm food grade polypropylene, 900 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Beauty And Spa Equipment Case: 6 mm PMMA acrylic Carry Cases from Drawing to Production

Vacuum forming case study: carry cases for beauty and spa equipment produced in 6 mm PMMA acrylic, 120 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: HDPE Machine Housings for Fitness Equipment – 1500 Parts at 1.5 mm

Vacuum forming case study: machine housings for fitness equipment produced in 1.5 mm HDPE, 1500 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Textile Machinery Case: 5 mm ABS/PMMA Plastic Enclosures from Drawing to Production

Vacuum forming case study: plastic enclosures for textile machinery produced in 5 mm ABS/PMMA, 120 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

250 Hoods LDPE Thermoformed for Defence And Security Equipment in 6 Weeks

Vacuum forming case study: hoods for defence and security equipment produced in 1.5 mm LDPE, 250 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Signage And Wayfinding Builder Replaced a fabricated PVC assembly with Vacuum Formed Control Panels in ABS/PC

Vacuum forming case study: control panels for signage and wayfinding produced in 12 mm ABS/PC, 3600 pieces, tooling to first article in 4 weeks, full dimensional reporting.

1 Views PPOEM 17 Sep,2026

Case Study: recycled HDPE Dashboards for Aerospace Interiors – 120 Parts at 6 mm

Vacuum forming case study: dashboards for aerospace interiors produced in 6 mm recycled HDPE, 120 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

120 Ventilation Shrouds flame retardant ABS Thermoformed for Playground Equipment in 5 Weeks

Vacuum forming case study: ventilation shrouds for playground equipment produced in 3 mm flame retardant ABS, 120 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: polycarbonate Instrument Bezels for Elevator And Escalator Interiors – 3600 Parts at 10 mm

Vacuum forming case study: instrument bezels for elevator and escalator interiors produced in 10 mm polycarbonate, 3600 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026