900 Storage Bins ABS/PC Thermoformed for Battery Energy Storage in 6 Weeks

Vacuum forming case study: storage bins for battery energy storage produced in 2 mm ABS/PC, 900 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Dental Equipment Builder Replaced a rotomoulded shell with Vacuum Formed Cart Panels in ASA

Vacuum forming case study: cart panels for dental equipment produced in 8 mm ASA, 120 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: PC/ASA Plastic Enclosures for Refrigeration – 8000 Parts at 4 mm

Vacuum forming case study: plastic enclosures for refrigeration produced in 4 mm PC/ASA, 8000 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Dental Equipment Builder Replaced a rotomoulded shell with Vacuum Formed Splash Guards in Kydex acrylic PVC

Vacuum forming case study: splash guards for dental equipment produced in 1.5 mm Kydex acrylic PVC, 5000 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Fitness Equipment Case: 8 mm Kydex acrylic PVC Tank Liners from Drawing to Production

Vacuum forming case study: tank liners for fitness equipment produced in 8 mm Kydex acrylic PVC, 3600 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: PMMA acrylic Wheel Covers for Industrial Robotics – 8000 Parts at 3 mm

Vacuum forming case study: wheel covers for industrial robotics produced in 3 mm PMMA acrylic, 8000 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Garden And Outdoor Power Equipment Builder Replaced a machined aluminium housing with Vacuum Formed Centre Consoles in PC/ASA

Vacuum forming case study: centre consoles for garden and outdoor power equipment produced in 6 mm PC/ASA, 400 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

8000 Access Panels ASA Thermoformed for Truck And Bus in 6 Weeks

Vacuum forming case study: access panels for truck and bus produced in 10 mm ASA, 8000 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: HIPS Instrument Bezels for Vending And Kiosk – 5000 Parts at 5 mm

Vacuum forming case study: instrument bezels for vending and kiosk produced in 5 mm HIPS, 5000 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: ABS/PC Centre Consoles for Telecom And Network Cabinets – 120 Parts at 4 mm

Vacuum forming case study: centre consoles for telecom and network cabinets produced in 4 mm ABS/PC, 120 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Ev Charging Case: 2 mm UV stabilised HDPE Wheel Covers from Drawing to Production

Vacuum forming case study: wheel covers for EV charging produced in 2 mm UV stabilised HDPE, 1500 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Office Furniture Case: 1.5 mm UV stabilised HDPE Skid Plates from Drawing to Production

Vacuum forming case study: skid plates for office furniture produced in 1.5 mm UV stabilised HDPE, 1500 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026