3 mm food grade polypropylene cowls manufactured for cleaning and sanitation equipment: food grade polypropylene sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 2-3 wee
Free QuoteThese food grade polypropylene cowls are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from food grade polypropylene sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | cowls |
| Typical application | cleaning and sanitation equipment |
| Material | food grade polypropylene |
| Standard gauge | 3 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | clear protective film, hot stamped accents, pad printed logos |
| Minimum order | 10 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Food grade polypropylene is used for trays, hoppers and liners that touch product, and it can be washed with caustic cleaners.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current cowls with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.