Home / Product / OEM plastic supplier / 5 mm TPO Access Panels Manufacturer for Hvac Equipment /
5 mm TPO access panels manufactured for HVAC equipment: TPO sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 2-3 weeks.
Free QuoteThese TPO access panels are thick gauge vacuum formed parts supplied to drawing for HVAC equipment. They are formed from TPO sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | access panels |
| Typical application | HVAC equipment |
| Material | TPO |
| Standard gauge | 5 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | pad printed logos, two coat polyurethane paint, silk screened markings |
| Minimum order | 5 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

TPO sheet is used where the part lives outdoors: it stays flexible in the cold and resists UV without a coating.
Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.
Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current access panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.