PETG Hoppers Vacuum Formed in 5 mm for Commercial Laundry

PETG Hoppers Vacuum Formed in 5 mm for Commercial Laundry

5 mm PETG hoppers manufactured for commercial laundry: PETG sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 7-15 working days.

Free Quote

These PETG hoppers are thick gauge vacuum formed parts supplied to drawing for commercial laundry. They are formed from PETG sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoppers

Product specification

ItemValue
Producthoppers
Typical applicationcommercial laundry
MaterialPETG
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsEMI shielding coating, two coat polyurethane paint, clear protective film
Minimum order50 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PETG keeps the weight down while stiffness is held through the formed shape
  • Emi shielding coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • drum covers
  • control bezels
  • detergent tray liners
  • machine front panels
  • hoppers used across general commercial laundry builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming hoppers from PETG sheet

Material: PETG

PETG forms at a low temperature, holds detail well and is accepted for food contact, which suits trays, guards and machine covers in food plants.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • EMI shielding coating
  • two coat polyurethane paint
  • clear protective film
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • PPAP or ISIR on request
  • UL94 V-0 grades available
  • material certificates with every batch

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed hoppers ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current hoppers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message