10 mm UV stabilised HDPE Battery Boxes Manufacturer for Telecom And Network Cabinets

10 mm UV stabilised HDPE Battery Boxes Manufacturer for Telecom And Network Cabinets

10 mm UV stabilised HDPE battery boxes manufactured for telecom and network cabinets: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 3-4 weeks.

Free Quote

These UV stabilised HDPE battery boxes are thick gauge vacuum formed parts supplied to drawing for telecom and network cabinets. They are formed from UV stabilised HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

battery boxes

Product specification

ItemValue
Productbattery boxes
Typical applicationtelecom and network cabinets
MaterialUV stabilised HDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionshot stamped accents, as formed gloss, satin finish
Minimum order10 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Hot stamped accents finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • antenna radomes
  • cabinet tops
  • cable trays
  • equipment shelves
  • battery boxes used across general telecom and network cabinets builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming battery boxes from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • plan the trim line on a flat face so the router can hold tolerance

Finishing and assembly options

  • hot stamped accents
  • as formed gloss
  • satin finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • ISO 9001 quality system
  • REACH compliant sheet available
  • material certificates with every batch

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed battery boxes ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current battery boxes with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message