Protective Guards 2 mm TPO Supplier for Ev Charging Equipment

Protective Guards 2 mm TPO Supplier for Ev Charging Equipment

2 mm TPO protective guards manufactured for EV charging: TPO sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 7-15 working days.

Free Quote

These TPO protective guards are thick gauge vacuum formed parts supplied to drawing for EV charging. They are formed from TPO sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

protective guards

Product specification

ItemValue
Productprotective guards
Typical applicationEV charging
MaterialTPO
Standard gauge2 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionstwo coat polyurethane paint, EMI shielding coating, hot stamped accents
Minimum order25 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • TPO keeps the weight down while stiffness is held through the formed shape
  • Two coat polyurethane paint finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • RoHS compliant grades available

Typical applications

  • wallbox covers
  • cable management panels
  • charger housings
  • payment terminal bezels
  • protective guards used across general EV charging builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming protective guards from TPO sheet

Material: TPO

TPO sheet is used where the part lives outdoors: it stays flexible in the cold and resists UV without a coating.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • plan the trim line on a flat face so the router can hold tolerance
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • two coat polyurethane paint
  • EMI shielding coating
  • hot stamped accents
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • material certificates with every batch
  • dimension reports with every release
  • REACH compliant sheet available

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed protective guards ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message