Preventing bubbles in the sheet Before Tooling Is Cut – Outdoor Parts

bubbles in the sheet is one of the faults that shows up during sampling on any new thick gauge tool. It is visible on the part, but the cause is usually in the mould, the heating cycle or th

0 Views PPOEM 17 Sep,2026

How to Measure mould venting in Vacuum Forming – Outdoor Parts

This guide covers how to measure mould venting on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

How to maintain insert placement on Thick Gauge Parts

This guide covers how to maintain insert placement on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before too

0 Views PPOEM 17 Sep,2026

Draft angle Explained for Thick Gauge Buyers – Large Housings

In vacuum forming and thermoforming, draft angle is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explains what it

0 Views PPOEM 17 Sep,2026

Trim lead time the Right Way – Painted Parts

This guide covers how to trim lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is cut

0 Views PPOEM 17 Sep,2026

How to improve batch repeatability on Thick Gauge Parts – Large Housings

This guide covers how to improve batch repeatability on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before t

0 Views PPOEM 17 Sep,2026

Specify shrinkage allowance: A Practical Thermoforming Guide – Food Contact Parts

This guide covers how to specify shrinkage allowance on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before t

0 Views PPOEM 17 Sep,2026

Measure lead time – Method and Checks – Food Contact Parts

This guide covers how to measure lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Calculate shrinkage allowance the Right Way – Painted Parts

This guide covers how to calculate shrinkage allowance on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before

0 Views PPOEM 17 Sep,2026

Insert moulding Compared with post moulded inserts – Outdoor Parts

insert moulding and post moulded inserts are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part.

0 Views PPOEM 17 Sep,2026

What cooling jig Means on a Formed Part – Large Housings

In vacuum forming and thermoforming, cooling jig is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explains what it

0 Views PPOEM 17 Sep,2026

Plan first article approval the Right Way – Outdoor Parts

This guide covers how to plan first article approval on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before t

0 Views PPOEM 17 Sep,2026